The Details
Single wind turbine connected to National Grid
The installation of a pre-owned refurbished 1,3 MW turbine in Turraheen Upper in 2019
Onsite ground Preparation works

Construction of wind turbine

The installation of a pre-owned refurbished 1,3 MW turbine in Turraheen Upper in 2019

